for SW Pit AuEq = Au + 1.6823*Cu +0.0124 *Ag, for X22 Pit AuEq = Au + 1.5628*Cu +0.0128 *Ag. AuEq was calculated using metal prices of $1,850/oz Au; $4.25/lb Cu and $23.00/oz Ag. Troilus Gold Corp. is ...
Troilus Gold has announced that it has awarded BBA the contract for the basic and detailed engineering work for the copper and gold Troilus Project. BBA has a long-standing connection with the ...
Reports that it has expanded its engineering team with three key appointments, further strengthening its capabilities as the Troilus Project advances into the development and construction phase.